Green fit-out agreement
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, defines a green fit-out agreement as:
‘A formal contractually binding agreement between a building developer or owner and their tenants. As such, a green fit-out agreement (or ‘green’ clauses or sections in a lease agreement) can be used as evidence demonstrating compliance with the relevant BREEAM issue criteria at the interim design and final post-construction stages of assessment. The agreement should make specific reference to the specification requirements or levels claimed, and as defined by BREEAM in this technical manual, where credits are awarded. BREEAM aims to encourage a mutually beneficial relationship between the shell and core developer or owner of a building and its future tenants so that the fully fitted operational building achieves performance against the highest possible environmental standards. In order to achieve this, BREEAM encourages and rewards the use of formal legally binding green fit-out agreements between a developer or owner and their tenant. Where a legally binding green fit-out agreement is provided as evidence and it commits the tenant’s fit-out to meet the criteria of this BREEAM issue, credits are available to be awarded.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.